Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
Gwadar Port is situated on the:
A. Bay of Bengal
B. Arabian Sea
C. Red Sea
D. Caspian Sea
Correct Answer: B
Gwadar lies on the Arabian Sea near the entrance to the Persian Gulf region.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
Bostan Special Economic Zone is situated in:
A. Punjab
B. Sindh
C. Balochistan
D. Azad Kashmir
Correct Answer: C
Bostan SEZ is located in Balochistan.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
Dhabeji Special Economic Zone is located in:
A. Sindh
B. Punjab
C. Balochistan
D. Khyber Pakhtunkhwa
Correct Answer: A
Dhabeji SEZ is located in Thatta District, Sindh.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
Allama Iqbal Industrial City is located in:
A. Punjab
B. Sindh
C. Gilgit-Baltistan
D. Azad Kashmir
Correct Answer: A
It is a major CPEC-linked industrial zone near Faisalabad in Punjab.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
Rashakai Special Economic Zone is located in:
A. Punjab
B. Sindh
C. Khyber Pakhtunkhwa
D. Balochistan
Correct Answer: C
Rashakai SEZ is located in Nowshera District, Khyber Pakhtunkhwa.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
ML-1 under CPEC relates to the modernization of Pakistan’s:
A. Main railway line
B. Oil pipeline
C. Air-defence system
D. Coastal highway
Correct Answer: A
ML-1 is the principal Karachi–Peshawar railway corridor proposed for upgrading.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
Eastbay Expressway is primarily associated with:
A. Lahore
B. Gwadar
C. Faisalabad
D. Peshawar
Correct Answer: B
Eastbay Expressway connects Gwadar Port with Pakistan’s national highway network.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The Multan–Sukkur Motorway is a section of the:
A. Karachi–Lahore Motorway
B. Islamabad–Murree Expressway
C. Karakoram Highway
D. Makran Coastal Highway
Correct Answer: A
The M-5 Multan–Sukkur section forms part of the Karachi–Lahore Motorway system.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The CPEC optical-fibre route enters Pakistan through:
A. Torkham
B. Taftan
C. Wagah
D. Khunjerab
Correct Answer: D
It enters Pakistan from Xinjiang through the Khunjerab border.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The CPEC cross-border optical-fibre cable is approximately:
A. 220 km
B. 420 km
C. 820 km
D. 1,820 km
Correct Answer: C
The cable extends about 820 kilometres from Khunjerab toward Rawalpindi.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
Suki Kinari Hydropower Project is located on the River:
A. Kunhar
B. Kabul
C. Sutlej
D. Swat
Correct Answer: A
It is constructed on the Kunhar River, a tributary of the Jhelum.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The Suki Kinari Hydropower Project has an installed capacity of:
A. 720 MW
B. 884 MW
C. 1,000 MW
D. 1,320 MW
Correct Answer: B
Suki Kinari is an 884-MW hydropower project in Mansehra.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The Karot Hydropower Project is situated on the River:
A. Indus
B. Chenab
C. Jhelum
D. Ravi
Correct Answer: C
Karot is located on the Jhelum River near the Punjab–AJK boundary.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The Karot Hydropower Project has a capacity of:
A. 660 MW
B. 720 MW
C. 884 MW
D. 1,320 MW
Correct Answer: B
Karot is a 720-MW hydropower project.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The Port Qasim power project was completed in:
A. 2016
B. 2018
C. 2020
D. 2023
Correct Answer: B
The project was completed on 25 April 2018.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The installed capacity of the Port Qasim Coal Power Project is:
A. 500 MW
B. 720 MW
C. 1,000 MW
D. 1,320 MW
Correct Answer: D
The Port Qasim project consists of two 660-MW units, totalling 1,320 MW.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The Sahiwal Coal Power Plant became operational in:
A. 2013
B. 2015
C. 2017
D. 2020
Correct Answer: C
The project was completed in October 2017.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
The installed capacity of the Sahiwal Coal Power Plant is:
A. 660 MW
B. 720 MW
C. 884 MW
D. 1,320 MW
Correct Answer: D
The operational Sahiwal project has an installed capacity of 1,320 MW.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
Participation by third countries in CPEC is:
A. Permanently prohibited
B. Welcomed under an agreed Pakistan–China model
C. Limited to NATO states
D. Possible only through the UN Security Council
Correct Answer: B
Pakistan and China have welcomed third-party participation on mutually agreed terms.
Pakistan Affairs (P.A)
1947 - Present - Relations - Pak - China Relations
CPEC is officially presented as a framework of:
A. Regional connectivity
B. Political annexation
C. Religious integration
D. Military occupation
Correct Answer: A
Its official purpose is to promote connectivity, trade and regional economic development.