CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Practice

Chashma Nuclear Power Plant MCQs

Practice important Chashma Nuclear Power Plant MCQs with answers, explanations, theory links, and exam-focused preparation.

Which option best explains your concept?
Instant answer validation
Performance tracking
Timed mock tests

Step-by-Step

Detailed Explanations

54,554

Practice MCQs

27

Mock Tests

95%

Success Focus

Chashma Nuclear Power Plant

Chashma Nuclear Power Plant MCQs With Answers

Only MCQs mapped to Chashma Nuclear Power Plant are shown on this page. You are viewing page 2.

Find Your Question Instantly

Search by keyword, subject, topic, or exact MCQ text.

CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
Approximately how much net electricity did C-2 generate in 2025?
A. 1,990.1 GWh
B. 2,304.3 GWh
C. 2,589.3 GWh
D. 7,590.6 GWh
Read Theory
Correct Answer: B
PAEC reports 2,304.3 GWh net generation from C-2 in 2025.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
Approximately how much net electricity did C-1 generate in 2025?
A. 1,990.1 GWh
B. 2,304.3 GWh
C. 2,589.3 GWh
D. 6,972.5 GWh
Read Theory
Correct Answer: A
PAEC reports 1,990.1 GWh net generation from C-1 in 2025.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
Which Chashma unit produced the most net electricity in 2025?
A. C-1
B. C-2
C. C-3
D. C-4
Read Theory
Correct Answer: C
C-3 generated about 2,589.3 GWh net in 2025, the highest among the four Chashma units.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
What was C-3's availability factor in 2025?
A. 77.9%
B. 82.4%
C. 86.9%
D. 96.8%
Read Theory
Correct Answer: D
PAEC reports C-3's availability factor as 96.8% for 2025.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
Which Chashma unit had the highest availability factor in 2025?
A. C-1
B. C-2
C. C-3
D. C-4
Read Theory
Correct Answer: C
C-3 had the highest availability factor at 96.8% in 2025.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
What was C-4's capacity factor in 2025?
A. 75.4%
B. 79.6%
C. 87.4%
D. 94.1%
Read Theory
Correct Answer: B
PAEC reports C-4's 2025 capacity factor as 79.6%.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
What was C-2's capacity factor in 2025?
A. 75.4%
B. 79.6%
C. 87.4%
D. 94.1%
Read Theory
Correct Answer: C
PAEC reports C-2's 2025 capacity factor as 87.4%.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
What was C-1's capacity factor in 2025?
A. 75.4%
B. 82.4%
C. 87.4%
D. 96.8%
Read Theory
Correct Answer: A
PAEC reports C-1's 2025 capacity factor as 75.4%.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
What was C-3's capacity factor in 2025 according to PAEC?
A. 75.4%
B. 79.6%
C. 87.4%
D. 94.1%
Read Theory
Correct Answer: D
PAEC reports a 94.1% capacity factor for C-3 in 2025.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
Which Chashma unit had the highest capacity factor in PAEC's 2025 statistics?
A. C-1
B. C-2
C. C-3
D. C-4
Read Theory
Correct Answer: C
C-3 recorded the highest 2025 capacity factor among Chashma units at 94.1%.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
A reactor SCRAM refers to:
A. A rapid emergency shutdown of the reactor
B. Routine refueling
C. Startup of the turbine
D. Grid synchronization
Read Theory
Correct Answer: A
SCRAM is a rapid shutdown achieved by rapidly inserting shutdown/control rods or equivalent safety action.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
The main fissile isotope commonly used in low-enriched uranium fuel for PWRs is:
A. Uranium-235
B. Uranium-238 only
C. Thorium-232
D. Plutonium-244
Read Theory
Correct Answer: A
Low-enriched uranium fuel increases the proportion of fissile uranium-235.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
Control rods in a nuclear reactor are used mainly to:
A. Absorb neutrons and regulate the chain reaction
B. Produce steam directly
C. Increase uranium enrichment
D. Generate electricity in the grid
Read Theory
Correct Answer: A
Control rods absorb neutrons, allowing operators to regulate or stop the fission chain reaction.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
Why is water kept under high pressure in a PWR primary circuit?
A. To make it freeze
B. To prevent boiling at reactor operating temperature
C. To enrich uranium
D. To reduce turbine speed
Read Theory
Correct Answer: B
High pressure keeps the primary coolant from boiling despite its high temperature.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
In a PWR, ordinary water primarily serves as:
A. Only fuel
B. Coolant and moderator
C. Control-rod material
D. Radioactive waste
Read Theory
Correct Answer: B
A pressurized water reactor uses light water as both coolant and neutron moderator.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
The basic purpose of a reactor containment structure is to:
A. Increase electricity tariff
B. Confine radioactive material during abnormal conditions
C. Store coal
D. Cool transmission lines
Read Theory
Correct Answer: B
Containment provides a major physical barrier against release of radioactive material.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
C-2's operating license, after revalidation, is valid up to:
A. 2027
B. 2030
C. 2031
D. 2035
Read Theory
Correct Answer: C
PNRA states that C-2's operating license was revalidated up to December 2031.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
C-1's operating license was revalidated after its second Periodic Safety Review up to:
A. 2026
B. 2027
C. 2030
D. 2035
Read Theory
Correct Answer: C
PNRA states that C-1's operating license is valid through December 2030.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
A Periodic Safety Review (PSR) is mainly used to:
A. Set electricity prices
B. Reassess plant safety for continued operation
C. Calculate fuel taxes
D. Select transmission lines
Read Theory
Correct Answer: B
Periodic Safety Reviews reassess plant safety and support continued licensing decisions.
CSS - PMS - CCE - PCS - Pakistan Affairs (P.A) Chashma Nuclear Power Plant
The PNRA regional office responsible for regulatory oversight at Chashma is:
A. RNSD-I
B. RNSD-II
C. RNSD-III
D. RNSD-IV
Read Theory
Correct Answer: B
PNRA identifies Regional Nuclear Safety Directorate-II (RNSD-II) at Chashma.
Why Students Like It

Built For Focused Exam Preparation

A clean learning system that keeps students practicing, improving, and coming back.

Instant Feedback

Students immediately know the correct answer and learn from explanations.

Real Exam Practice

Timed mock tests help users prepare for real exam pressure.

Weak Area Tracking

Performance insights help students focus on the topics that need attention.